JR Trippe Middle School

Project Descriptions:

  • Owner: Vidalia City Schools
  • Location: Vidalia, Georgia
  • Size: 94,000 SF
View All Project

The purpose of this project was to upgrade the mechanical systems while simultaneously providing a facelift. JR Trippe was renovated durning the school’s summer break.

Cosmetic work included interior renovation which involved flooring removal and replacement, painting, acoustical ceiling removal and replacement, reverse the swing on all existing classroom doors, CMU wall demolition and installation of new room layouts, and new epoxy flooring in specified areas.

MEP work included new lighting and electrical in new ceilings, new energy recovery units in every corridor, placed on new pourin- place concrete mezzanines, and new wall hung HVAC units at
every classroom. In the kitchen new make-up air supply was provided.

Exterior work included a new decorative steel canopy with architectural standing seam metal roof. New aluminum bus canopies, sidewalks, repaint and re-stucco where required, new masonry entry columns and wall seating.